Position Title: Junior Cost Accounting |
Reports to: Finance Controller |
Department: Finance |
Location: HARTING India (Production), Chennai
|
POSITION SUMMARY
HARTING Company Introduction– High-performance connection technology forms the basis of industrial application and product technology. The HARTING range of products and solutions comprises connectors, device connection technology and network components. HARTING products connect machines and facilities via data, signal and power. HARTING employs around 5,000 people across its 44 sales companies and 14 production locations.
The candidate for this position needs to have proven capabilities for Monthly financial report submitting, Report analysis by division, monitor TP Calculation to H production companies, All TPs Maintenance Regularly, Cost and Tax Risk control.. This position is based in Chennai, Tamilnadu. India.
QUALIFICATIONS
Education |
Required: |
ICWA (Inter/group) & B.com or M.com or MBA Good command of English (written and spoken) |
|
Preferred: |
Male/Female candidates are preferred. |
|
||
Work Experience |
Required: |
At least 3-5 years in Finance position in a manufacturing environment |
|
Preferred: |
Dealing with electromechanical products preferably cable assemblies, Wiring Harness and connectors. |
ESSENTIAL FUNCTIONS
- cost review via SAP according to HARTING group policy and accounting rule of PRC.
- Support Month-end closing and report analysis by division.
- Cost, activity, Key statistics figure review and comparison
- Update distribution and assessment cycle.
- Input data to SAP and HARTING Finance system.
- Check Monthly Cost Cat. analysis by departments with cost center
- comparison with LE data in the same period and last year
- Activity performance review
- Actual labour and OH price review
- Plannedprice2 preparation after comparison with moving price
- Plannedprice2 upload by ZCO_PL_SIM
- Cost price/ L0140 & L0180 calculation in YTD information, input to SAP by KP26 SIM version
- Planned price1 preparation after comparison with moving price and Plannedprice2
- Plannedprice1 upload by ZCO_PLPRICE-Maintenance of 'Planned Price'
- Capability price calculation
- Capability review by cost center, L0180 revising and input by KP26 in version "CAP" for IE new TP calculation.